pt analyzer

  • 0512-2025

    Wrindu Wins Ethiopian Electric Power Project Contract

    Wrindu signs a new contract with ETHIOPIAN ELECTRIC POWER to supply transformer, switchgear, and CT/PT testing equipment, which supports Ethiopia's grid upgrade and GERD maintenance.

  • 0611-2024

    On-Site CT/PT Testing Procedures and Precautions

    In the routine maintenance and inspection of power systems, testing current transformers (CT) and potential transformers (PT) is essential for ensuring the safe and stable operation of electrical equipment.

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy